8/31/22 Laying out Electronics + First Two Sided Test

 Colin Szeto

Added in the battery and emo box representation onto the top of the wam-v platform


File location:

Electronics > “laying out on the top of the platform”

Construction of all 4 sides of the landing platform

The longer bars compressing 

Thinking of utilizing steel cables to make a criss cross pattern to introduce rigidity to the design


Reference here

By the end of the day utilizing off cuts this was the current configuration of the drone landing platform. A solution for supporting the landing plate the drone feet will interface with has yet to be designed.